DHL relies on ULMA's Multi V+ system to improve drainage at its Düsseldorf facilities
Deutsche Post DHL, one of the world's largest postal and logistics companies, stores and distributes thousands of parcels daily.
That's why the choice of an efficient drainage system for its shipping base is key.
For its logistics centre at Kieshecker Weg, very close to Düsseldorf airport, DHL has chosen ULMA's Multi V+ drainage system, and I will tell you why:
This channel, made of polymer concrete and with a V-shaped design, stands out for its high evacuation capacity, the water passes through at a higher speed than in a traditional U-shaped channel displacing the sediments inside it easily; thus achieving a self-cleaning effect.
The Multi V+ family also incorporates the Rapidlock® system, a screwless fixing system that allows quick and secure installation, helping to optimise maintenance time and costs.
Another key advantage is that each metre of Multi V+ channel has eight fixing points, compared to four on other standard models. This even distribution of loads and forces reduces the risk of damage and extends the life of the channels.
In short, MultiV+ channels combine savings in maintenance, installation and construction costs, optimising the final cost of the project.
With this choice, DHL ensures smooth and safe operations in line with its standards for quality and efficiency in its logistics processes.
Don't be left behind: contact our technical sales team for your project and receive persona